Prepare enter the tunnel once finished the spraying with a wet shotcrete machine

Follow these steps to ensure safety, efficiency, and quality control:

 

1. Ensure Proper Ventilation

Purpose: Remove dust, fumes, and moisture generated during the spraying process.

Use ventilation systems to clear the air inside the tunnel, ensuring it is safe for workers.

Monitor oxygen levels and the presence of harmful gases like CO2 or methane using gas detectors.

 

2. Inspect the Applied Shotcrete

Visual Inspection: Check the quality and uniformity of the sprayed concrete.

Thickness Check: Verify that the shotcrete meets the specified thickness and coverage requirements.

Adherence Check: Look for any signs of poor adhesion or hollow spots.

 

3. Stabilization Period

Allow sufficient time for the shotcrete to stabilize and achieve initial set strength. This depends on the mix design, ambient temperature, and humidity conditions.

Use accelerators in the shotcrete mix if quicker setting times are needed.

 

4. Secure Loose Materials

Check for and remove any loose rocks or debris that could pose a hazard to personnel entering the tunnel.

Confirm the stability of the surrounding rock and support systems.

 

5. Safety Protocols

PPE (Personal Protective Equipment): Ensure workers have appropriate PPE, including helmets, gloves, respiratory masks, safety glasses, and high-visibility vests.

Access Restrictions: Limit entry to trained and authorized personnel only.

 

6. Test the Area

Conduct a test run of the machinery to confirm everything is functioning correctly before proceeding with further operations.

Use probing or testing equipment to check the hardness and integrity of the applied shotcrete.

 

7. Clean and Maintain Equipment

Clean the shotcrete machine thoroughly to prevent clogging and ensure its longevity.

Inspect hoses, nozzles, and pumps for wear or damage.

 

8. Communicate the Plan

Conduct a safety briefing to ensure all team members are aware of the tasks, risks, and emergency procedures.

Assign specific roles to team members, such as monitoring structural stability or overseeing the next spraying phase.

 

9. Monitor Environmental Conditions

Continuously monitor temperature, humidity, and vibration levels, which can affect the shotcrete's curing and the tunnel's safety.

By following these steps, you can ensure a smooth and safe transition into the tunnel after shotcrete application.

 