What should be paid attention to when spraying the top of the tunnel with a wet spraying machine?

Here's a comprehensive list:

 

1. Safety Precautions

Fall Protection: Ensure workers are protected from falling debris or rebound material. Use proper scaffolding, platforms, or manlifts.

Ventilation: Maintain adequate ventilation to remove dust, rebound, and fumes, especially in confined tunnel spaces.

Personal Protective Equipment (PPE): Workers should wear helmets, goggles, respirators, gloves, and protective clothing.

Stability Check: Assess the stability of the rock or surface before spraying to avoid sudden falls or collapses.

 

2. Surface Preparation

Clean Surface: Remove loose materials, dust, oil, and water from the surface. A clean, damp (not wet) surface ensures better adhesion.

Anchoring Mesh: If using reinforcing mesh or rock bolts, ensure they are securely fastened and properly positioned before spraying.

 

3. Mix Design and Consistency

Correct Water-Cement Ratio: Maintain a proper water-cement ratio for optimal pumpability and adhesion.

Additives: Use appropriate admixtures (accelerators, retarders, plasticizers) depending on tunnel conditions like temperature or shotcrete thickness.

 

4. Spraying Technique

Nozzle Distance and Angle: Keep the nozzle 1–1.5 meters from the surface, at a 90-degree angle, especially on the crown to ensure good compaction and minimal rebound.

Layer Thickness: Apply in thin layers to avoid sagging or delamination. Multiple passes may be necessary.

Even Coverage: Move the nozzle steadily and evenly to avoid over-thick or thin areas.

 

5. Rebound Management

Control Rebound: Use correct spray angle and nozzle velocity to minimize material rebound, which is higher on overhead surfaces.

Rebound Removal: Do not reuse rebound material; remove it promptly to maintain quality.

 

6. Curing and Setting

Initial Set Monitoring: Allow for initial setting before applying subsequent layers or exposing to heavy vibration.

Curing: Apply appropriate curing methods (e.g., mist spraying or curing compounds) to prevent shrinkage and ensure strength development.

 

7. Machine Maintenance

Equipment Check: Regularly inspect and maintain the wet spraying machine, hoses, and nozzle to prevent clogging or malfunctions.

Pump Pressure: Ensure consistent pump pressure for uniform spray and material flow.

 

Would you like a checklist format or printable version for field use?

 

A 30m wet shotcrete machine is enough for tunnel that less than 1 km in length 5 -

A 30m wet shotcrete machine is enough for tunnel that less than 1 km in length 7