Application Process
Tunnel excavation is completed by drilling and blasting or mechanical excavation.
The arch-frame installation carriage moves into the excavation area.
Hydraulic arms lift the steel arch segments into position.
Workers complete connections, bolts, and welding operations.
The tunnel proceeds to the next support stage, such as mesh installation and shotcrete spraying.







