As concrete pump commonly used in construction site, the concrete mixing pump has been widely used in various engineering fields. At present, many construction parties use the mixing pump to achieve the purpose of mixing and transporting concrete. However, in use, mixing pump also needs regular cleaning and maintenance to extend the service life, so how to clean and maintain the mixing pump? Now let's introduce it as follows.
trailer concrete mixing pump is a kind of vehicle developed for concrete transportation, which can be used for on-site mixing. Because it can be mixed and transported, it is very suitable for small civil buildings, so it is very popular with the majority of construction parties. In daily work, how to clean and maintain the mixing pump? It can be done from the following points.
1. Cleaning and maintenance
In daily work, ensure the cleaning of the concrete mixing pump body, maintain the mixing pump regularly, and thoroughly remove the dirt and other impurities in the body. After each operation, the concrete mixing pump must be cleaned.
2. Lubrication and maintenance
Before operation every day, check the oil, circuit and control equipment at each lubricating place, and fill the lubricating oil as required. It is necessary to adopt two-level leakage protection for the mixing towing pump. Before operation, the power supply shall be connected first, and then it shall be checked carefully. The normal operation can be carried out only after it is confirmed to be qualified by the idle test run.
3. Circuit check
It is necessary to adopt two-level leakage protection for the mixing towing pump. Before operation, the power supply shall be connected first, and then it shall be checked carefully. The normal operation can be carried out only after it is confirmed to be qualified by the idle test run. After starting the mixing pump, check whether the operation of each part is normal. When stopping the machine, be sure to check whether the mixer blades are bent and whether the screws are broken or loose.
4. Parts inspection
Before operation every day, it is necessary to check whether the transmission clutch and brake are sensitive and reliable, whether the steel wire rope is damaged, whether the track pulley is in good condition, whether there are obstacles around and the lubrication of various parts. Before daily operation, water is added into the mixing drum to idle for 1 to 2 seconds, and the reliability of operation of clutch and brake equipment is checked at the same time. In the process of concrete mixing and towing pump operation, attention shall be paid at any time to check whether the noise of motor, reducer and transmission gear is normal and whether the temperature is too high. The operator shall pay attention to the use problem of easily worn parts in real time. If the service life of easily worn parts is up, they shall be replaced in time.




