Wet shotcrete machine what spare parts usually need to ready

1. Pumping System Parts

These are high-wear components due to concrete abrasion:

Wear plate and cutting ring (or wear ring)

Concrete piston (rubber piston or piston cup)

Delivery cylinder (S-tube or concrete cylinder)

Mixing hopper sieve and agitator blades

S-valve or Rock valve and its shaft bushings/seals

 


 

2. Hydraulic System Parts

Hydraulic parts ensure arm and pump motion:

Hydraulic hoses (various lengths and pressure ratings)

O-rings and sealing kits

Hydraulic filters (return, suction, pressure)

Hydraulic oil (recommended grade)

Solenoid valves or proportional valves

 


 

3. Spraying System Parts

Important for stable spraying quality:

Spray nozzle assemblies (complete sets and tips)

Accelerator pump parts (diaphragm, valves, hoses)

Air hose fittings and clamps

Water control valve and pressure gauge

 


 

4. Electrical and Control Parts

Keep these for control safety and reliability:

Remote control battery / charger

Control panel switches, relays, and fuses

Sensors (pressure, temperature, stroke sensors)

 


 

5. Miscellaneous and Maintenance Items

Grease and lubricants

Hopper rubber seals and gaskets

Cleaning balls for delivery pipe

Concrete delivery pipes and elbows

Clamps and rubber gaskets for pipeline joints

 

Would you like us to make a detailed spare parts checklist (with part names, functions, and recommended stock quantities) for a specific model of wet shotcrete machine (e.g., 30 m³/h, 40 m³/h, or truck-mounted type)?

 