Oct 14, 2026 Leave a message

Using A Dual-Boom Hydraulic Drilling Jumbo For Tunnel Rock Bolt Support Construction

Dual-boom operation: Enables two drilling operations to be carried out simultaneously when site conditions permit.

Efficient rock bolt drilling: Supports rock bolt installation preparation for tunnel reinforcement.

Hydraulic drilling system: Provides controlled, precise drilling for tunnel support work.

Reduced manual labor: Reduces reliance on manual drilling and helps improve workforce productivity.

Wide applications: Suitable for highway tunnels, railway tunnels, hydropower tunnels, and underground mining projects.

 

Double-boom rock drilling jumbo 1

Send Inquiry

whatsapp

Phone

E-mail

Inquiry