Truck Mounted Concrete Mixer Pump
The Saner JBC40-10 Truck Mounted Concrete Mixer Pump is an integrated concrete mixing and pumping machine designed for efficient on-site construction. Combining a forced twin-shaft mixer with a high-pressure pumping system, it provides continuous and reliable concrete supply for building construction, tunnels, mining, and infrastructure projects.
Key Features & Advantages
All-in-One Mobility: Integrates concrete mixing, conveying, and pumping into a single mobile truck-mounted platform, eliminating the need for separate stationary mixers and pumps.
Dual Power Flexibility: Equipped with both an electric motor (37kW) and a diesel engine (130kW), ensuring seamless operation on remote sites or locations with unstable power supplies.
Large Aggregate Processing: Features large-diameter delivery cylinders and a high-strength S-valve distribution system capable of handling concrete aggregates up to 40mm.
High-Pressure Hydraulic System: Utilizes a dual pump and dual circuit open hydraulic system with a Kawasaki main oil pump for stable, long-distance material transport.
Robust Build Quality: Built on a reliable Dongfeng chassis powered by a Weichai diesel engine, ensuring rugged durability under heavy-duty working environments.
Product Parameters
| TECHNICAL PARAMETERS | MODEL: JBC40-10 | |||||||
| Pumping System | ||||||||
| Max theoretic output | 40m³/h | |||||||
| Max theoretic pumping pressure | 10Mpa | |||||||
| Hydraulic system | Double pump & Double circuit opening | |||||||
| Main oil pump displacement | 112ml/r(kawasaki) | |||||||
| Power supply | Electric engine+Diesel engine | |||||||
| Voltage | 380V | / | ||||||
| Engine power | 37KW+18.5KW | 130KW | ||||||
| Distribution valve type | S pipe valve | |||||||
| conveying cylinder bore/stroke | Ф200/1100mm | |||||||
| Max aggregate size | 40mm | |||||||
| Mix Hopper Volume | 500L | |||||||
| Pump Hopper Volume | 800L | |||||||
| Feeding height | ≤1450mm | |||||||
| Max theoretic delivery vertical distance | 80m | |||||||
| Max theoretic delivery horizontal distance | 300m | |||||||
| The radiator cooling type | Air cooling system | |||||||
| Hydraulic pump type | Ram pump | |||||||
| Concrete slump | 130-240mm | |||||||
| Chassis Parameters | ||||||||
| Chassis manufacturer | DongFeng | |||||||
| Engine model | WeiCai | |||||||
| Fuel type | Diesel | |||||||
| Emission standard | National Ⅲ | |||||||
| Rated power | 120KW | |||||||
| Rated speed | 60KM/H | |||||||
| Whole Machine | ||||||||
| Outer dimensions(L*W*H) | 7220×2200×3550mm | |||||||
| Total weight | 13100kg | |||||||

Working Principle
Mixing Phase: Raw materials (cement, water, sand, and aggregates up to 40mm) are loaded into the 500L mixing hopper. The twin-shaft compulsory mixing system uses counter-rotating shafts with specialized mixing arms to create strong shearing forces, blending the materials uniformly into high-quality concrete.
Discharging & Feeding: The mixed concrete is discharged directly into the 800L pump hopper.
Pumping Phase: The dual-circuit hydraulic system drives the main ram pumps, pushing the concrete through the large-diameter delivery cylinders (Φ200mm) and the S-valve distribution system.
Delivery Phase: High-pressure hydraulic action forces the concrete smoothly through pipelines, achieving vertical heights up to 80m or horizontal distances up to 300m directly to the pouring point.

Product work video:
Quality Control & Production Process
Raw Material Inspection: Comprehensive screening of all structural steels and core components prior to fabrication.
Component Assembly Inspection: Precise calibration and testing of critical hydraulic, electrical, and mechanical sub-assemblies during assembly.
Hydraulic Pressure Testing: Rigorous pressure testing of the pumping circuits to verify system stability, seal integrity, and pressure tolerance.
Full Machine Performance Testing: Simulating actual operating conditions on-site to verify mechanical responsiveness and output capacity.
Final Delivery Inspection: Detailed auditing and issuance of full inspection traceability records before dispatch.
FAQ
Q1: What is the minimum order quantity (MOQ) for international procurement?
A1: The minimum order quantity is 1 unit, supporting both single-project purchases and bulk distributor orders.
Q2: What is the standard production lead time upon order confirmation?
A2: Standard production and factory dispatch take between 15 to 25 working days depending on custom configuration requirements.
Q3: Are OEM and customized color or branding options available for global distributors?
A3: Yes, we provide full OEM and private-label customization including corporate branding, specific paint colors, and localized electrical setups.
Q4: What warranty terms and after-sales protection are provided with each unit?
A4: Each machine comes with a 12-month standard global warranty covering core hydraulic and structural components.
Q5: How are replacement wear parts shipped to international project sites?
A5: Critical wear parts are dispatched via air express or international freight couriers from our spare parts inventory to minimize project downtime.
Q6: Does Saner provide on-site commissioning and operator training overseas?
A6: Yes, professional factory-certified engineers can be dispatched to your job site for installation supervision, operational training, and technical commissioning.
Q7: Which international shipping ports are normally utilized for exporting the equipment?
A7: Shipments are primarily handled through major Chinese ports such as Shanghai, Shenzhen, and Guangzhou, supporting container or Ro-Ro shipping methods.
Q8: What payment terms and financial instruments are accepted for international trade?
A8: We accept secure international transaction methods including Letter of Credit (L/C), Telegraphic Transfer (T/T), and other standard commercial trade terms.
Q9: How does the dual-power configuration optimize fuel and energy consumption on site?
A9: It allows operators to utilize low-cost electric grid power during stationary phases and switch instantly to the Weichai diesel engine when operating in remote or mobile locations.
Q10: What kind of pre-shipment documentation is supplied for customs clearance?
A10: We provide a complete set of export documents including Commercial Invoices, Packing Lists, Certificates of Origin, CE compliance certificates, and Bills of Lading.


Hot Tags: truck mounted concrete mixer pump, China truck mounted concrete mixer pump manufacturers, suppliers, factory, Concrete Mixer and Pumping Machine
You Might Also Like
Send Inquiry